Boatyard General Permit - New

Description/Purpose

This General Permit ensures that the wastewater and stormwater runoff from boatyards is disposed of safely as to cause no harm to the environment.

Triggers and activities which would require this credential

This Statewide general permit applies to boatyards that discharge stormwater runoff from areas with industrial activity directly to the ground, to a surface waterbody, or to a storm sewer system that drains to a surface waterbody. This general permit also regulates process wastewater from pressure washing in boatyards.

A boatyard is a commercial business engaged in the construction, repair, and maintenance of small vessels, 85 percent of which are 65 feet or less in length, or revenues from which constitute more than 85 percent of gross receipts.

Services typically provided by boatyards include, but are not limited to:

  • Repair and replacement of engine and propulsion systems, e.g., shafts, propellers, and rudders
  • Repair and replacement of the fuel and lubrication systems
  • Repair and replacement of marine sanitation devices (MSDs)
  • Hull repair, joinery, welding, and grinding
  • Vessel deconstruction activity on land
  • Bottom and topside painting and coating
  • Topside cleaning
  • Pressure washing
  • Buffing and waxing
  • Bilge cleaning
  • Other activities necessary to maintain a vessel

For more information about what activities do and do not require a permit, visit the Boatyard General Permit More Information webpage: https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Boatyard-general-permit

Explanation/Description of costs/fees, including statutory, regulatory, or other legal authority for fees

Ecology does not charge an application fee for this General Permit. However, there is a coverage fee, which varies depending on discharge. Fee amounts can change. For current fees, see the permit fee schedule in Chapter 173-224 WAC.

Application Information

The application is called 'Request for coverage under the National Pollutant Discharge Elimination System (NPDES) Boatyard General Permit' is online and can be accessed at https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Boatyard-general-permit.

You must also include a Site Sketch, as an electronic "pdf" or "jpg" attachment. Ecology may request additional information or have questions after reviewing the application form.

Note that a facility wanting to begin operations must conduct a public notice announcement in the newspaper. The applicant must publish a public notice once each week for two consecutive weeks (twice), at least seven days apart, in a newspaper of general circulation within the county in which the discharge is proposed. Coverage may be issued 30 days after the second public notice.

When making the decision on your permit, Ecology will consider the applicable laws and rules, the contents of your application, and the background environmental conditions.

In addition, the permitting process includes public participation. This means that the public may submit comments to Ecology during the public comment period to support or oppose your proposed activity. If any comments are received, Ecology must review and respond to the comments and take them into consideration when making the decision to issue or deny permit coverage.

You should submit your electronic application through the Water Quality Permitting Portal at https://secureaccess.wa.gov/ecy/wqwebportal/.

To access the WQWebPortal, you must first register for Secure Access Washington (SAW). For additional information about SAW, visit: https://support.secureaccess.wa.gov/.

If you need help, contact the appropriate regional office or call the statewide contact noted here: https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Boatyard-general-permit

Your General Permit is valid for up to five years. Coverage for a facility begins at time of application approval and ends when the General Permit expires or your coverage is revoked. Ecology may administratively extend the General Permit past five years until the agency has completed the permit renewal process.

An applicant or any interested party has a right to appeal this permit decision to the Pollution Control Hearings Board (PCHB) within 30 days of the date of receipt of this permit. The appeal process is governed by Chapter 43.21B RCW and Chapter 371-08 WAC. “Date of receipt” is defined in RCW 43.21B.001(2).

You must also comply with other applicable requirements in Chapter 43.21B RCW and Chapter 371-08 WAC.

Read the Pollution Control Board’s Appeal Process web page for more details.

Also see WAC 173-226-190 for more info on appeals.

.
Permit Timeliness Results

Permit Timeliness data collection is in response to a State Auditor’s Performance Audit and RCW 43.42A. Each regulatory agency developed a plan to improve permit clarity, predictability, and timeliness. Each agency considers the customers experience to ensure permit assistance is simple to use, easy to access, and designed in a customer-friendly manner. Agencies report progress to the Governor’s Office for Regulatory Innovation and Assistance (ORIA). ORIA prepares and distributes reports, with participation from the State Auditor’s Office and Results Washington. See latest report here: https://www.oria.wa.gov/ORIA-2020-PermitTimelinessProgressReport.pdf.


Estimated Time Required By the Agency to Process a Permit Application (Definition)
Average days from Receipt to Complete: 77
Maximum days from Receipt to Complete: 117

Estimated Time Required By the Agency to Issue a Permit Decision (Definition)
Average days from Complete Application to Decision: 7.5
Maximum days from Complete Application to Decision: 59

(Summary results based on 2 submittals in 2024)

.
Legal authority
Notes / Comments

While applications should be submitted electronically, you can find a hardcopy application which is called 'Request for coverage under the National Pollutant Discharge Elimination System (NPDES) Boatyard General Permit', online at https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Boatyard-general-permit.

Contacts
Department of Ecology
Headquarters
300 Desmond Drive
PO Box 47600
Olympia WA 98504-7600
Website: http://www.ecology.wa.gov/
Telephone: (360) 407-6000
Department of Ecology, Northwest Regional Office
Dawn Marie Maurer
3190 - 160th Avenue SE
Bellevue WA 98008-5453
Website: http://www.ecology.wa.gov/
Telephone: (425) 649-7000
Fax: (425) 649-7098
Department of Ecology, Southwest Regional Office
300 Desmond Drive
PO Box 47775
Olympia WA 98504-7775
Website: http://www.ecology.wa.gov/
Telephone: (360) 407-6300
Fax: (360) 407-6305
Department of Ecology, Central Regional Office
15 West Yakima Avenue, Suite #200
Yakima WA 98902-3452
Website: http://www.ecology.wa.gov/
Telephone: (509) 575-2490
Fax: (509) 575-2809
Department of Ecology, Eastern Regional Office
4601 N Monroe
Spokane WA 99205-1295
Website: http://www.ecology.wa.gov/
Telephone: (509) 329-3400
Fax: (509) 329-3529
* Credential details last updated 8/14/2023