Help/Assistance

For assistance information and materials please visit https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Dangerous-waste-permits.

Other sources of help, information, and references:

Subject matter expert contact information:

See notes/comments for link to contacts.

Open an email to submit... [be sure and attach this document]

id: 1057

Dangerous Waste Treatment Storage and Disposal Facility - Modification

Description/Purpose

To modify an existing Dangerous Waste Treatment, Storage, and Disposal Facility Permit, protect human health and the environment and ensure the facility knows what is required to comply with the dangerous waste regulations.

Triggers and activities which would require this credential

Any modification or change to your existing Dangerous Waste Permit. Examples are:

  • A change in facility ownership.
  • Facility expansion or alteration.
  • A change in procedures, process or contact information.
  • Change in information.
  • New regulation.
  • Compliance schedule.
Explanation/Description of costs/fees, including statutory, regulatory, or other legal authority for fees

There are no costs/fees associated with a permit modification.

Application Information

There is no specific application for a permit modification request. The facility must submit a written letter in hard copy and electronic format to request a modification. The following information must be in the letter:

  • Name, identification number, and location of facility.
  • Name and telephone number of the permittee's contact person.
  • Proposed modification class.
  • Modification number.
  • Modification description (explain why the modification is needed).
  • A brief description of the changes at the operation.
  • List of affected section in the permit and permit application.
  • Specific (Description of the) changes to the permit, including all of its attachments (i.e., permit application).
  • Any additional supporting documentation of the changes.
  • Public notice.
  • Certification statement.

Yes, if you are applying for a significant expansion.

  1. You must submit a Notice of Intent to the Department of Ecology 150 days before modification submittal.
  2. You must demonstrate that the facility location meets siting criteria. Examples of siting criteria include setbacks from certain areas, such as residences, and excludes facilities from other areas, such as floodplains. If you cannot meet siting criteria, demonstrate that the changes result in an overall benefit to the environment.
  3. Comply with the State Environmental Policy Act (SEPA).

Submit all information to the Department of Ecology at the address below.

For the life of the permit.

You have a right to appeal this permit to the Pollution Control Hearings Board (PCHB) within 30 days of the date of receipt of this permit. The appeal process is governed by Chapter 43.21B RCW and Chapter 371-08 WAC. “Date of receipt” is defined in RCW 43.21B.001(2).

You must also comply with other applicable requirements in Chapter 43.21B RCW and Chapter 371-08 WAC.

Read the Pollution Control Board’s Appeal Process web page for more details.

.
Permit Timeliness Results

Permit Timeliness data collection is in response to a State Auditor’s Performance Audit and RCW 43.42A. Each regulatory agency developed a plan to improve permit clarity, predictability, and timeliness. Each agency considers the customers experience to ensure permit assistance is simple to use, easy to access, and designed in a customer-friendly manner. Agencies report progress to the Governor’s Office for Regulatory Innovation and Assistance (ORIA). ORIA prepares and distributes reports, with participation from the State Auditor’s Office and Results Washington. See latest report here: https://www.oria.wa.gov/ORIA-2020-PermitTimelinessProgressReport.pdf.


Estimated Time Required By the Agency to Process a Permit Application (Definition)
Average days from Receipt to Complete: 13
Maximum days from Receipt to Complete: 28

Estimated Time Required By the Agency to Issue a Permit Decision (Definition)
Average days from Complete Application to Decision: 39.7
Maximum days from Complete Application to Decision: 157

(Summary results based on 6 submittals in 2024)

.
Legal authority
Schematic
View the schematic
Contacts
Department of Ecology
Hazardous Waste & Toxics Reduction Program
Headquarters
300 Desmond Drive
PO Box 47600
Olympia WA 98504-7600
Website: https://ecology.wa.gov/About-us/Get-to-know-us/Our-Programs/Hazardous-Waste-Toxics-Reduction
Telephone: (360) 407-6700
Fax: (360) 407-6715
* Credential details last updated 8/22/2023
[v3]