The application should include a line drawing summarizing all wastewater flows in the facility. This should indicate all wastewater sources, wastewater volumes, chemicals used and their concentrations, pretreatment processes, wastewater discharge ID numbers and Treatment/Disposal Methods (TDMs) used as specified in Section E of the application.
Any existing facility previously under this permit and for which no significant process change has occurred or is planned, shall submit to Ecology only the Application for Coverage under this general permit at least 180 days before permit expiration.
Any new facility shall submit to Ecology, at least 90 days before any discharge, the Application for Coverage, an engineering report if a major wastewater treatment system is to be constructed, an Affidavit of Publication certifying that the public notice requirements have been met, and either a certification that SEPA requirements have been met and a copy of the SEPA determination or an explanation of what is being done to comply with SEPA requirements.
The application should include a line drawing summarizing all wastewater flows in the facility. This should indicate all wastewater sources, wastewater volumes, chemicals used and their concentrations, pretreatment processes, wastewater discharge ID numbers and Treatment/Disposal Methods (TDMs) used as specified in Section E of the application.
Any existing facility previously under this permit and for which no significant process change has occurred or is planned, shall submit to Ecology only the Application for Coverage under this general permit at least 180 days before permit expiration.
Any new facility shall submit to Ecology, at least 90 days before any discharge, the Application for Coverage, an engineering report if a major wastewater treatment system is to be constructed, an Affidavit of Publication certifying that the public notice requirements have been met, and either a certification that SEPA requirements have been met and a copy of the SEPA determination or an explanation of what is being done to comply with SEPA requirements.
Your General Permit is valid for up to 5 years. Coverage for a facility begins at time of application approval and ends when the General Permit expires or your coverage is revoked. The next term of the Water Treatment Plant General Permit will expire on August 31, 2021. However, Ecology may administratively extend the General Permit past 5 years until the agency has completed the permit renewal process.
You have a right to appeal this permit coverage to the Pollution Control Hearings Board (PCHB) within 30 days of issuance of this general permit. The appeal process is governed by Chapter 43.21B RCW and Chapter 173-226 WAC. “Date of receipt” is defined in RCW 43.21B.001(2). To appeal you must do both of the following within 30 days after the date of receipt of issuance of this general permit:
- File your appeal and a copy of the permit cover page with the Pollution Control Hearings Board (PCHB) during regular business hours.
- Serve a copy of your appeal and the permit cover page on Ecology in paper form, by mail or in person. E-mail is not accepted.
Consideration of an appeal of general permit coverage of an individual discharger is limited to the general permit’s applicability or inapplicability to that individual discharger.
Physical Addresses
Department of Ecology
Attn: Appeals Processing Desk
300 Desmond Drive SE
Lacey, WA 98503
Pollution Control Hearings Board
1111 Israel Road SW, Suite 301
Tumwater, WA 98501
Mailing Addresses
Department of Ecology
Attn: Appeals Processing Desk
P.O. Box 47608
Olympia, WA 98504-7608
Pollution Control Hearings Board
P.O. Box 40903
Olympia, WA 98504-0903