Prevention of Significant Deterioration (PSD) Air Quality Permit

Description/Purpose

The Prevention of Significant Deterioration (PSD) permit was developed to prevent significant environmental impacts on air quality from large industrial sources of air pollution. The permit applies to new or modified air pollution sources that are classified as “major” relative to air pollution emissions potential, and that are proposing construction projects that may “significantly” increase their air pollutant emissions.

Under the PSD program, the projects demonstrate that they are designed in a way to ensure compliance with air quality regulations that protect human health and the environment. The PSD application process is complex and requires applicants to conduct engineering evaluations and computer modeling to demonstrate the proposed project will meet air quality standards.

Triggers and activities which would require this credential

A facility with a new major source of air pollution with the potential to emit a pollutant regulated under the Federal Clean Air Act at 100 tons/year for 28 specific emission source types, or 250 tons/year or more for all other emission source types.

A modification of an existing major source of air pollution that increases emissions of a pollutant regulated under the Federal Clean Air Act at or above PSD Significant Emission Rates (SER).

If you are not sure if your activity requires this permit you can request a PSD program applicability review. An applicability determination has a $500 fee.

Explanation/Description of costs/fees, including statutory, regulatory, or other legal authority for fees

The fees for applying for a PSD new or modified permit vary depending on the type of project. The following document “New Air Quality Permitting Fees Effective July 2011” provides more specifics about fees: https://fortress.wa.gov/ecy/publications/SummaryPages/1102028.html.

Application Information

The application is called 'Application for a Prevention of Significant Deterioration Applicability Determination' is online and can be accessed at https://fortress.wa.gov/ecy/publications/SummaryPages/ECY070413.html.

A PSD application typically contains the following information:

  • Process description.
  • Operational limits.
  • Best Available Control Technology (BACT).
  • Allowable emission rates.
  • Results of on-site measurements.
  • Results of air quality impact modeling.
  • Results of air-quality-related values (AQRV) assessment, such as impacts on national parks and wildlife areas.
  • All emissions calculations.

Ecology recommends the source schedule a pre-application meeting to provide guidance on what specifically needs to be included in the PSD application for the proposed project.

The State Environmental Policy Act (SEPA) and EPA consultation on impacts related to the Endangered Species Act (ESA) and Historical Preservation Acts (HPA) must be complete before the permit can be issued. These processes occur outside of the PSD process.

The application is submitted to:

   Washington State Department of Ecology
   Air Quality Program
   Science and Engineering Section
   P.O. Box 47600
   Olympia, Washington 98504-7600

Once issued the permit does not expire unless cancelled by the applicant.

You have a right to appeal this PSD permit to the Pollution Control Hearings Board (PCHB) within 30 days of the date of receipt of the permit. The appeal process is governed by Chapter 43.21B RCW and Chapter 371-08 WAC. “Date of receipt” is defined in RCW 43.21B.001(2).

You must also comply with other applicable requirements in Chapter 43.21B RCW and Chapter 371-08 WAC.

.
Permit Timeliness Results

Permit Timeliness data collection is in response to a State Auditor’s Performance Audit and RCW 43.42A. Each regulatory agency developed a plan to improve permit clarity, predictability, and timeliness. Each agency considers the customers experience to ensure permit assistance is simple to use, easy to access, and designed in a customer-friendly manner. Agencies report progress to the Governor’s Office for Regulatory Innovation and Assistance (ORIA). ORIA prepares and distributes reports, with participation from the State Auditor’s Office and Results Washington. See latest report here: https://www.oria.wa.gov/ORIA-2020-PermitTimelinessProgressReport.pdf.


Estimated Time Required By the Agency to Process a Permit Application (Definition)
Average days from Receipt to Complete: 262
Maximum days from Receipt to Complete: 496

Estimated Time Required By the Agency to Issue a Permit Decision (Definition)
Average days from Complete Application to Decision: 130
Maximum days from Complete Application to Decision: 147

(Summary results based on 2 submittals in 2024)

.
Legal authority
Schematic
View the schematic
Contacts
Department of Ecology
Air Quality Program
Headquarters
300 Desmond Drive
PO Box 47600
Olympia WA 98504-7600
Website: https://ecology.wa.gov/Regulations-Permits/Permits-certifications/Air-Quality-permits/Air-operating-permits
Telephone: (360) 407-6800
Fax: (360) 407-7534
Department of Ecology
Headquarters
300 Desmond Drive
PO Box 47600
Olympia WA 98504-7600
Website: http://www.ecology.wa.gov/
Telephone: (360) 407-6000
* Credential details last updated 8/13/2019
[v3]