Yes, Ecology must receive the documents below to consider the application complete.
- Solid Waste Disposal Plan
- Deconstruction and Site Management Plan
- Verification of hazardous materials testing for all anticipated waste streams
If your site discharges to an impaired waterbody on the state's 303(d) list, Ecology may require additional documentation before issuing permit coverage and these sites may be subject to additional requirements.
Note: A new facility applying for coverage under this permit must publish a public notice announcement, once each week for two consecutive weeks (twice), at least seven days apart, in a newspaper of general circulation within the county in which the discharge is proposed. Coverage may be issued 30 days after the second public notice.
If your site discharges to an impaired waterbody on the state's 303(d) list, Ecology may require additional documentation before issuing permit coverage.
Applicable State Environmental Policy Act (SEPA) requirements must be satisfied.
Ecology must review and respond to any public comments and consider them when making the decision to issue or deny permit coverage.
Washington Department of Ecology
Water Quality Program - Vessel Deconstruction
PO Box 47696
Olympia, WA 98504-7696
Ecology reissues all vessel deconstruction general permits every 5 years. All facilities with permit coverage must reapply for coverage 180 days before the expiration date. The current permit expires on December 5, 2024.
An order, permit, license, or decision can be appealed within 30 days from the “date of receipt” of the decision. The appeal process is governed by RCW 43.21B and WAC 371-08. “Date of receipt” is defined in RCW 43.21B.001(2). Get more information on the Pollution Control Hearings Board web page.