The project review submittal form for a new LOSS must be accompanied by a check for $800, which is the initial review fee.
The owner of a proposed new LOSS submits the first operating permit fee based on the department’s design flow approval.
The annual operating permit fee and renewal fee must accompany the applications.
DOH will determine the permit fee for an existing LOSS with no prior DOH permit based on information received in the application and will invoice the system owner.
For new LOSS, the operating permit won't be issued until the design and specifications are reviewed and approved. The permit conditions will be based on the LOSS rule, Chapter 246-272B WAC, to protect public health and the environment. One component of the project submittal is proof of consistency with local government planning. The project may also have to meet the requirements of the Department of Archaeological and Historic Preservation, since excavation will occur.
The permit for an existing LOSS with no DOH permit will contain similar operating requirements as a permit for a new system, and may include submittals dates for items such as engineering inspection and evaluation documents, a record drawing, and operations and maintenance manual.
The LOSS operating permit is valid for one year after the issue date and must be renewed annually.
Approval to construct or modify a LOSS is valid for 2 years. If it expires before construction begins, all process approvals become void, as does the operating permit. The owner may submit a written request for a single extension of up to two years before the original approval expires. The pre-construction operating permit is valid for one year and must be renewed annually.
An applicant or permit holder contesting a departmental decision regarding a permit, certificate, approval, or fine may file a written request with DOH for an adjudicative proceeding. Third parties aggrieved by permit decisions for a LOSS with peak daily flow over 14,500 gallons may also file a written request for an adjudicative proceeding. Such an adjudicative proceeding will be consistent with Chapter 34.05 RCW. For details and deadlines, see WAC 246-272B-08200 and WAC 246-272B-08300.