Help/Assistance

For assistance information and materials please visit https://agr.wa.gov/services/licenses-permits-and-certificates/summary-descriptions/special-poultry-permit.

Helpdesk phone:

(360) 902-1876

Subject matter expert contact information:

foodsafety@agr.wa.gov

Open an email to submit... [be sure and attach this document]

id: 2447

Special Poultry Permit

Description/Purpose

Special Poultry Permits are required for on-farm preparation and sale of whole raw slaughtered poultry.

Triggers and activities which would require this credential

Activities include slaughter, preparation or sale of whole, raw poultry (1000 or fewer poultry per calendar year).

Explanation/Description of costs/fees, including statutory, regulatory, or other legal authority for fees

One year permit= $75
Two year permit= $125

Application Information

The application is called 'Application for Special Poultry Permit:To Slaughter, Prepare, and Sell Whole Raw Poultry' is online and can be accessed at https://agr.wa.gov/getmedia/370b6b5d-154e-4017-906a-c93f73bd6625/3302-application-for-special-permit-to-slaughter-poultry-rev-5-2012.

Complete application along with:

  • Poultry slaughter/preparation site diagram
  • Detailed processing steps or flow diagram
  • Water supply testing
  • Check or money order

A WSDA Food Safety Officer (FSO) reviews all processing areas of your facility and takes the necessary water samples. Before leaving the facility, the FSO will leave a copy of the inspection report with you. The inspection report will note any areas that require correction. At that time the inspector will also inform you of your licensing status (approved or denied). All subsequent inspections are unannounced visits and will occur every three to six months.

Water test is done by the applicant, not the agency.

Submit application to the address below:

   WSDA Food Safety Program
   1111 Washington St
   Olympia, WA 98504

Applicants have the option to obtain a 1 year permit or a 2 year permit.

Upon notice by the Department to deny or revoke a permit, a person may request a hearing under chapter 34.05 RCW, the Administrative Procedures Act.

.
Permit Timeliness Results

Permit Timeliness data collection is in response to a State Auditor’s Performance Audit and RCW 43.42A. Each regulatory agency developed a plan to improve permit clarity, predictability, and timeliness. Each agency considers the customers experience to ensure permit assistance is simple to use, easy to access, and designed in a customer-friendly manner. Agencies report progress to the Governor’s Office for Regulatory Innovation and Assistance (ORIA). ORIA prepares and distributes reports, with participation from the State Auditor’s Office and Results Washington. See latest report here: https://www.oria.wa.gov/ORIA-2020-PermitTimelinessProgressReport.pdf.


Estimated Time Required By the Agency to Process a Permit Application (Definition)
Average days from Receipt to Complete: 12.5
Maximum days from Receipt to Complete: 28

Estimated Time Required By the Agency to Issue a Permit Decision (Definition)
Average days from Complete Application to Decision: 54.5
Maximum days from Complete Application to Decision: 141

(Summary results based on 11 submittals in 2024)

.
Legal authority
Contacts
Washington State Department of Agriculture
Food Safety Program
1111 Washington Street SE
Olympia WA 98504
Email: foodsafety@agr.wa.gov
Website: http://agr.wa.gov
Telephone: (360) 902-1876
* Credential details last updated 10/25/2022
[v3]