Yes - approval will be based on several factors, but center around safety of the public, applicant, and roadway at the requested access connection point. A meeting will be scheduled to overview the proposed Access Connection.
Applications are reviewed within the WSDOT regions, based on the location of the requested Access Connection. See Notes/Comments section below.
Once the permit is signed and the connection is built, the permit is valid. All connection permits issued by the department remain valid until revoked. The department may initiate an action to revoke any permit if significant changes have occurred in the use, design, or traffic flow of the property or of the state highway, requiring the relocation, alteration, or closure of the connection; if the connection was not constructed at the location or to the design specified in the permit; if the permit provisions were not met; or if the connection causes a safety, maintenance, or operational problem on the state highway system.
The right to an adjudicative proceeding can be requested within 30 days of a denial letter from WSDOT. WSDOT will notify the applicant of the date and time of the proceeding. WAC 468-51-150 explains the appeal process.